Qatar residential construction projects

机译:卡塔尔住宅建筑项目

获取原文

摘要

Cost and schedule deviation from the estimated baseline are common in construction projects and have a negative effect on construction activity, which is a substantial portion of the GDP in most countries. Previous research studies examined the causes of deviation in several countries including some Gulf Council Countries (GCC) like Kuwait and the UAE, but none were done on the sizeable Qatari market. Qatar is expected to require an additional 93,000 residential units by the end of 2010 [1] to sufficiently address the rising demand, as a result of rapid population increase relative to supply [2]. Therefore, this study identified and ranked, using the Relative Importance Index (RII) method, the significant factors influencing cost and schedule deviation in Qatari residential compound projects. A detailed questionnaire was developed on a likert scale addressing these factors and was used to solicit the viewpoints of Grade A contractors. The collected project sample had a total capital investment of approximately $1.25 Billion and the projects were executed within a five year period (2000 – 2005). The study revealed that most contractors viewed material delays as the most prominent issue influencing construction projects predictability in Qatar. Other top ten factors included design changes, labor shortages, deficient estimates and cash flow planning.
机译:估计基线的成本和时间表偏差在建设项目中是常见的,对施工活动产生负面影响,这是大多数国家的GDP中的大部分。以前的研究研究检测了几个国家的偏差原因,包括一些海湾委员会国家(GCC),如科威特和阿联酋,但没有人在大量的卡塔尔市场上完成。卡塔尔预计将在2010年底预计额外的93,000个住宅单位[1]以充分解决需求的上升,由于速度快,相对于供应量增加[2]。因此,本研究确定并排名,使用相对重视指数(RII)方法,影响Qatari住宅复合项目成本和进度偏差的重要因素。详细的问卷是在解决这些因素的李克特量表上制定的,用于征求级别承包商的观点。收集的项目样品总资本投资约为12.25亿美元,项目在五年内(2000年至2005年)执行。该研究表明,大多数承包商认为材料延误是影响卡塔尔建设项目可预测性的最突出的问题。其他十大因素包括设计变更,劳动力短缺,缺乏估计和现金流量规划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号