首页> 外文会议>Conference on Environmental Science and Information Application Technology >Simulation Analysis of the potential exploitation of groundwater resources based on water projects in Luoyang
【24h】

Simulation Analysis of the potential exploitation of groundwater resources based on water projects in Luoyang

机译:基于洛阳水项目的地下水资源潜力开采仿真分析

获取原文

摘要

According to the groundwater level changes after the construction of Luohe River water projects in Luoyang, numerical simulation method is used to analysis the exploitation potential of groundwater resources of Luoyang Basin. The results show that the construction of Luohe River water projects strengthen the groundwater recharge from Luohe River, an increase of about 0,8×10~8 m~3/a. The groundwater recharge from Luohe River and Yihe River currently reach 2.78×10~8m~3/a in Luoyang. After the construction of water projects, water extraction volume is increasing at 6×10~4 m~3/d in Luonan water source, the center of the depression cone's water level dropped as deep as 2m; the exploitation amount is increasing at 6 ×10~4 m~3/d in Lilou water source, the center of the depression cone's water level dropped as deep as about 2.2m.
机译:洛阳漯河水项目建设后地下水位变化,数值模拟方法用于分析洛阳盆地地下水资源的开发潜力。结果表明,漯河水项目建设加强了漯河河的地下水补给,增加约0.8×10〜8米〜3 / a。地下水从漯河河和颐河河上充值,洛阳目前达到2.78×10〜8M〜3 / A。在建造水项目后,水萃取量在洛杉矶水源的6×10〜4米〜3 / d上升,凹陷锥水位的中心深厚为2米;李某水源的开发量在6×10〜4米〜3 / d中增加,凹陷锥水位的中心下降至约2.2米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号