首页> 外文会议>International forum on porous flow and applications >The Research on Underground Cut-off Seepage Technology in Wanghe Groundwater Reservoir
【24h】

The Research on Underground Cut-off Seepage Technology in Wanghe Groundwater Reservoir

机译:王河地下水储层地下截止渗流技术研究

获取原文

摘要

Many cut-off schemes are contrasted on pervious foundation conditions in the project of Wanghe Groundwater Reservoir, the methods of HPGCW and VSMHPGCW are recommended, the construction technology and parameter about cut off wall are ascertained through field test, meanwhile, the joint questions on VSMCW and HPGCW are solved. In fact it is proved that HPGCW and VSMHPGCW have good cut-off effect, especially VSMHPGCW has better cut-off effect, lower cost.
机译:许多截止方案对王河地下水储层项目中的渗透基础条件形成鲜明对比,建议使用HPGCW和VSMHPGCW的方法,通过现场测试确定切割墙壁的施工技术和参数,同时是VSMCW的联合问题和HPGCW解决了。实际上证明,HPGCW和VSMHPGCW具有良好的截止效果,特别是VSMHPGCW具有更好的截止效果,成本更低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号