首页> 外文会议>OnTheMove (OTM) Federated International Conferences >A Two-Stage Probabilistic Approach to Manage Personal Worklist in Workflow Management Systems
【24h】

A Two-Stage Probabilistic Approach to Manage Personal Worklist in Workflow Management Systems

机译:管理工作流管理系统中个人工作清单的两级概率方法

获取原文

摘要

The application of workflow scheduling in managing individual actor's personal worklist is one area that can bring great improvement to business process. However, current deterministic work cannot adapt to the dynamics and uncertainties in the management of personal worklist. For such an issue, this paper proposes a two-stage probabilistic approach which aims at assisting actors to flexibly manage their personal worklists. To be specific, the approach analyzes every activity instance's continuous probability of satisfying deadline at the first stage. Based on this stochastic analysis result, at the second stage, an innovative scheduling strategy is proposed to minimize the overall deadline violation cost for an actor's personal worklist. Simultaneously, the strategy recommends the actor a feasible worklist of activity instances which meet the required bottom line of successful execution. The effectiveness of our approach is evaluated in a real-world workflow management system and with large scale simulation experiments.
机译:工作流程调度在管理各个演员的个人工作清单中的应用是一个可能对业务流程带来巨大改进的一个领域。然而,当前的确定性工作不能适应个人工作清单管理中的动态和不确定性。对于这样的问题,本文提出了一种两级概率方法,旨在协助演员灵活地管理其个人工作清单。具体而言,该方法分析了每个活动实例在第一阶段满足截止日期的持续概率。基于该随机分析结果,在第二阶段,提出了一种创新的调度策略,以最大限度地减少演员个人工作清单的总截止日期违规成本。同时,该策略建议演员是活动实例的可行性工作清单,其符合所需的底线成功执行。我们的方法的有效性在真实的工作流管理系统和大规模模拟实验中进行了评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号