首页> 外文会议>OTM 2009;Confederated international conferences CoopIS, DOA, IS, and ODBASE 2009 >A Two-Stage Probabilistic Approach to Manage Personal Worklist in Workflow Management Systems
【24h】

A Two-Stage Probabilistic Approach to Manage Personal Worklist in Workflow Management Systems

机译:在工作流管理系统中管理个人工作清单的两阶段概率方法

获取原文

摘要

The application of workflow scheduling in managing individual actor's personal worklist is one area that can bring great improvement to business process. However, current deterministic work cannot adapt to the dynamics and uncertainties in the management of personal worklist. For such an issue, this paper proposes a two-stage probabilistic approach which aims at assisting actors to flexibly manage their personal worklists. To be specific, the approach analyzes every activity instance's continuous probability of satisfying deadline at the first stage. Based on this stochastic analysis result, at the second stage, an innovative scheduling strategy is proposed to minimize the overall deadline violation cost for an actor's personal worklist. Simultaneously, the strategy recommends the actor a feasible worklist of activity instances which meet the required bottom line of successful execution. The effectiveness of our approach is evaluated in a real-world workflow management system and with large scale simulation experiments.
机译:工作流调度在管理个人演员的个人工作清单中的应用是可以极大地改善业务流程的领域之一。但是,当前的确定性工作无法适应个人工作清单管理中的动态性和不确定性。针对此类问题,本文提出了一种两阶段概率方法,旨在帮助参与者灵活地管理其个人工作清单。具体来说,该方法在第一阶段分析了每个活动实例满足截止日期的连续概率。根据此随机分析结果,在第二阶段,提出了一种创新的调度策略,以最大程度地减少演员个人工作清单的总期限违反成本。同时,该策略向参与者建议活动实例的可行工作清单,该清单应满足成功执行所需的底线。我们的方法的有效性在真实的工作流管理系统中进行了评估,并通过大规模的模拟实验进行了评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号