首页> 外文会议>ASME Fluids Engineering Division conference >STUDY ON FIELD TEST AND SIMULATING CALCULATION FOLLOWING LOAD REJECTIONS OF TONGBAI PUMPED STORAGE POWER STATION
【24h】

STUDY ON FIELD TEST AND SIMULATING CALCULATION FOLLOWING LOAD REJECTIONS OF TONGBAI PUMPED STORAGE POWER STATION

机译:桐柏泵浦蓄能电站负荷抑制后现场测试与模拟计算研究

获取原文

摘要

Tongbai pumped storage plant of China have four sets of pump-turbines with single unit capacity 300MW, and the whole length of conveyance system about 1120m in which the lengths of diversion system and tailrace are about 748m and 347m respectively, rated head and discharge 244.0m and 143.5m~3/s, separately. The plant would have the field test before the units were put into operating to ensure safety in future, and the parameters of pump turbines and water conveyance pipe system of pumped storage power station are rectified according to field test datum. Numerical calculation and field test indicate that water hammer in pumped storage plant water conveyance system caused by wicket gate closing together with rotation speed-rise. Compared with field test data following load rejection of two sets of pump turbines on June 30th, 2006, simulating calculation has identical result, which would ensure Tongbai pumped storage power station safety.
机译:中国矛堰泵送储物厂拥有四套泵涡轮机,单位容量300mW,传送系统的整个传送系统长度约为1120米,分别为约74.8亿和347米,额定头部和排放量为约74.8亿和143.5m〜3 / s,分开。该工厂将在运行单位以确保将来的安全性之前进行现场测试,并且根据现场测试基准,泵浦存储电站的泵涡轮机和水输送管道系统的参数。数值计算与现场试验表明,泵浦储存厂水锤与旋转升温旋转升降液闭合引起的水锤。与2006年6月30日负载两套泵涡轮机的现场测试数据相比,模拟计算具有相同的结果,这将确保通达泵浦存储电站安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号