首页> 外文期刊>Energy and power engineering >Equivalent Substitution Based Method for Calculation of Best Installed Capacity of Pumped Storage Power Station
【24h】

Equivalent Substitution Based Method for Calculation of Best Installed Capacity of Pumped Storage Power Station

机译:基于等效替代的抽水蓄能电站最佳装机容量计算方法

获取原文
           

摘要

This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system running in two cases of whether the pumped storage power station is put into operation. The difference of the total coal consumption between the two cases is the peak load shifting benefit. Furthermore, we build load model and power generation model to calculate the benefit of emergency use and frequency modulation, which are the major projects of dynamic benefits. At last, on the premise of ensuring the system requirements, the developed method employs the maximum benefit of the unit capacity as the objective function to get the best installed capacity of pumped storage power station by simulations. Tests on a provincial power grid have shown that the developed method which combines of load characteristics, electric structure and other factors can get the best installed capacity of pumped storage power station easily and has a certain guiding significance for the planning and construction of the pumped storage power station.
机译:本文提出了一种计算抽水蓄能电站最佳装机容量的新方法。首先,我们选择最大负载的一天作为每月的典型一天,并在抽水蓄能电站是否已投入运行的两种情况下模拟系统运行。两种情况之间的总耗煤量之差是最大负荷转移效益。此外,我们建立负荷模型和发电模型以计算紧急使用和调频的效益,这是动态效益的主要项目。最后,在保证系统需求的前提下,通过仿真,以单位容量的最大收益为目标函数,得到抽水蓄能电站的最佳装机容量。在省级电网上的试验表明,该方法将负荷特性,电气结构等因素综合起来,可以很容易地获得抽水蓄能电站的最佳装机容量,对抽水蓄能电站的规划建设具有一定的指导意义。发电厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号