首页> 外文会议>Society of Plastics Engineers Eastern Regional Meeting >Montney Unconventional Gas - Next Generation, An Integrated Approach to Optimizing Wellbore Completions Technology
【24h】

Montney Unconventional Gas - Next Generation, An Integrated Approach to Optimizing Wellbore Completions Technology

机译:Montney非传统气体 - 下一代,一种优化Wellbore完成技术的综合方法

获取原文

摘要

In this paper we will present the evolution of well construction in the Montney play, technical and economical challenges, and the new synergy developed between drilling and completions. The financial driver that all operators are facing today is to lower well construction costs. The drilling and completions processes should not be looked at as separate entities but rather as an integrated team. This will allow for the achievement of an optimal solution for overall well construction, a solution that can not be achieved by either discipline in isolation. This paper demonstrates the evolution of a unique completion system that lowers costs in a technically challenging area. Case histories of two completion methods, swellable packers and cemented sliding sleeve technologies are discussed in detail. The cemented sliding sleeve systems were deployed at a field scale for the first time in North America in the Pouce Coupe area of Alberta, Canada in December 2008.
机译:在本文中,我们将展示蒙特尼的井建设的演变,技术和经济挑战,以及在钻井和完井之间开发的新协同作用。所有运营商都面临的财务司机正在降低井建设成本。钻孔和完成过程不应作为单独的实体看,而是作为综合团队。这将允许实现整体井结构的最佳解决方案,一种不能通过任何学科均衡的解决方案。本文展示了独特的完井系统的演变,这些系统降低了技术挑战性地区的成本。两种完井方法的案例历史,详细讨论了可膨胀的封隔器和粘合的滑动套筒技术。在2008年12月,在加拿大艾伯塔省佩斯轿跑区的北美地区,巩固的滑动套筒系统在北美首次部署了现场规模。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号