首页> 外国专利> Well completion method, including integrated approach for fracture optimization

Well completion method, including integrated approach for fracture optimization

机译:完井方法,包括用于裂缝优化的综合方法

摘要

Fracture design for well completion includes determining a conductivity profile for the given reservoir to be fractured. Materials needed to obtain this conductivity profile are selected based on their ability to meet the conductivity objective and their rank based on economic value. A further step gives the designer a pumping schedule to be performed on the surface after an initial test in the actual well. This can reduce the iterations required to optimize a fracturing treatment and significantly reduce the redesign process at the well site.
机译:用于完井的裂缝设计包括确定要压裂的给定油藏的电导率曲线。根据其满足电导率目标的能力以及根据经济价值的等级来选择获得此电导率曲线所需的材料。进一步的步骤为设计人员提供了在实际井中进行初步测试后要在地面上执行的抽水计划。这样可以减少优化压裂处理所需的迭代次数,并显着减少井场的重新设计过程。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号