Comprehensive Dam Reviews:A Cost-Effective Approach for Estimating Dam Risks for Small and Medium-Sized Dams

机译:综合水坝评论:一种估算中小型水坝大坝风险的经济有效方法

获取原文

摘要

The Bureau of Reclamation (Reclamation) has performed Comprehensive Facility Reviews (CFRs) for their inventory of 350 large dams for the past 14 years consistent with the intent of the Federal Guidelines for Dam Safety. Other Department of Interior bureaus with dams (particularly the Bureau of Indian Affairs) have worked with Reclamation to develop a Comprehensive Dam Review (CDR) product for their generally small to medium dams (10 to 70 feet high) at less cost than a CFR. The CDR product is a multi-disciplinary team effort to conduct a thorough review of a dam, estimate its failure risks, and provide recommended future dam safety actions. The main stages of the CDR are data collection, information sharing, failure mode development, site examination, risk estimation, expert panel review, and client briefing. The benefits of the CDR to the DOI bureaus include: identification and charting of all estimated dam safety risks, identification of unacceptably high risks which need priority action, targeting of future visual and instrumented monitoring to the key performance indicators/parameters for each dam, providing the ability for the dam safety program to manage its risks on a portfolio-wide basis, identification/prioritization of issues for further evaluation, and targeting of emergency management activities to reduce risks. This paper describes the role of the CDR in a dam safety program, steps used to develop CDRs, risk estimation and display in CDR work, achievement of CDR consistency/technical adequacy, and costs/benefits of CDRs.
机译:填海局(填海区)在过去的14年中,为350个大型水坝进行了全面的设施评论(CFRS),这与美国大坝安全联邦准则的意图一致。其他内部局与水坝(特别是印度事务局)致力于开发综合坝上的审查(CDR)产品,以较低的中等水坝(10至70英尺高),低于CFR。 CDR产品是一支多学科团队努力,对大坝进行全面审查,估计其失败风险,并提供建议的未来大坝安全行动。 CDR的主要阶段是数据收集,信息共享,故障模式开发,现场考试,风险估计,专家组审查和客户简报。 CDR对DOI局的好处包括:识别和图表所有估计的大坝安全风险,确定了需要优先诉讼的不可接受的高风险,瞄准未来视觉和仪器监测到每个大坝的关键绩效指标/参数,提供大坝安全计划能够在投资组合的基础上管理其风险,识别/优先顺序进行进一步评估,并针对应急管理活动来减少风险。本文介绍了CDR在大坝安全计划中的作用,用于在CDR工作中开发CDR,风险估计和显示的步骤,实现CDR一致性/技术充分性以及CDR的成本/福利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号