Increasing Emergency Preparedness through International Exercises

机译:通过国际练习增加应急准备

获取原文

摘要

BC Hydro and many dam owners around the world have emergency procedures for unusual or unexpected performance of its dams. In addition, they have emergency response plans that would be used by downstream response agencies to assist them in their roles of warning and evacuating those persons who would be threatened by a failure of the dam. Tes-ting and exercising of these plans is crucial in maintaining an effective level of preparedness. BC Hydro has a program of updating and testing the plans through "tabletop" exercises conducted every two years and extensive "functional" exercises every 2 or 3 years. The man-agement team from the specific facility and the key response agencies work through specific threats from a dam and ensure that communication and response activities are aligned. Although most rivers are fully contained within the Province of British Columbia, one notable exception is the Columbia River, which is the largest river flowing into the Pacific Ocean in North America. It is just over 2 000 km long, has a drainage area of 670 000 km2. The river originates in south-eastern British Columbia and flows into the United States before entering the Pacific Ocean near Portland Oregon. There are fourteen dams on the main stem of the Columbia River with seven utilities in-volved in their ownership and operation. This covers two countries (Canada and the United States), one Canadian province, 2 American states and over 30 local jurisdictions. It was important to BC Hydro, which owns and operates the three most upstream dams,that all downstream utilities and emergency response agencies would be able to work together effectively in the event of an emergency condition at one of its dams. To verify this, an inter-national emergency preparedness exercise was designed that would involve these utilities and agencies in a multi-day response to simulated emergency flood conditions driven by a major failure condition at one of BC Hydro's dams in Canada. The exercise, which took over a year to plan, was conducted over a 5 day period in early March 2008. The exercise involved 120 people in 6 hydroelectric utilities, two national or-ganizations and 3 provincial/state agencies and 12 of the 30 local jurisdictions. The exercise was viewed by all participants as a success with findings related to interna-tional flow coordination, use of metric and imperial measurements, and conveying technical flow information to local response agencies.
机译:BC Hydro和世界各地的大型大坝所有者都有紧急程序,以满足其水坝的异常或意外表现。此外,他们还有紧急响应计划,下游响应机构将用于帮助他们的警告和撤离那些因大坝失败而受到威胁的人的角色。这些计划的Tes-Ting和锻炼对于维持有效的准备水平至关重要。 BC Hydro通过每两年进行每两年进行的“桌面”练习,并每两年进行广泛的“功能”练习每2或3年进行更新和测试计划。来自特定设施的人员团队和关键响应机构通过大坝的具体威胁工作,并确保通信和响应活动对齐。虽然大多数河流在不列颠哥伦比亚省的省内完全包含,但一个值得注意的例外是哥伦比亚河,这是流入北美太平洋的最大河流。它长达2 000公里,具有670 000平方公里的排水区。河流起源于不列颠哥伦比亚省东南部,并在进入俄勒冈州波特兰岛附近的太平洋进入美国。哥伦比亚河主干上有十四座大坝,拥有七个公用事业,其所有权和运营中占有。这涵盖了两国(加拿大和美国),加拿大省,2名美国国家和30多个当地司法管辖区。对BC Hydro的重要性是拥有并经营三大大坝的,所有下游公用事业和紧急响应机构都能够在其中一个大坝的紧急情况下有效地共同努力。为了验证这一点,设计了一个国家间应急准备锻炼,这将涉及这些公用事业和机构在多日期的响应中,对加拿大BC水电大坝之一的主要失败状况驱动的模拟应急洪水条件。计划在2008年初为期5天的时间内进行了一年的练习。该练习涉及60名水电公用事业,两名国家或三个省/国家机构和30名本地省/国家机构和3名中的12人司法管辖区。所有参与者都会通过与国际流动协调,使用度量和Imperial测量的使用以及将技术流信息传达给当地响应机构的成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号