首页> 外文会议>World Non-Grid-Connected Wind Power and Energy Conference >Offshore Wind Farm Construction Platform Jack-Up Control System
【24h】

Offshore Wind Farm Construction Platform Jack-Up Control System

机译:海上风电场建设平台加盖控制系统

获取原文

摘要

Based on the requirements of the offshore wind farm construction, an intelligent remote control system has been proposed for jacking-up offshore platform. The system consists of a wireless LAN, a master control system, an intelligent node control system, and front sensors. The master control system is composed of a master control decision-making expert system, a malfunction diagnosis and disposal decision-making expert system, and database system, a virtual reality display system, and a wireless LAN system. The intelligent node control system consists of a control decision-making expert system, a jacking control system, a locking control system, a malfunction diagnosis system, executing controllers, status sensors, a database system, a pier-side control interface, and wireless LAN system. This remote control system enables a real-time analysis of the status of the platform, self adjusting of the platform, and memorizing previous decision for a better efficient control. This system supports independent execution with fault diagnosis & recovery ability. So it is recommended because it meets the requirements of offshore platform of wind farm construction.
机译:根据海上风电场建设的要求,提出了一个智能遥控系统,用于加紧海上平台。该系统由无线LAN,主控制系统,智能节点控制系统和前传感器组成。主控制系统由主控制决策专家系统,故障诊断和处置决策专家系统以及数据库系统,虚拟现实显示系统和无线LAN系统组成。智能节点控制系统由控制决策专家系统,顶升控制系统,锁定控制系统,故障诊断系统,执行控制器,状态传感器,数据库系统,码头侧控制接口和无线LAN组成系统。该遥控系统可以实时分析平台的状态,平台自调节,并记住先前的决定,以获得更好的有效控制。该系统支持与故障诊断和恢复能力的独立执行。所以建议是因为它符合风电场建设海上平台的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号