首页> 外文会议>AIChE National Meeting >Evaluating the Debottleneck Options for Existing LNG plants using Simulation Models
【24h】

Evaluating the Debottleneck Options for Existing LNG plants using Simulation Models

机译:使用仿真模型评估现有LNG工厂的脱差点选项

获取原文

摘要

There is a significant emphasis on utilizing the existing natural gas assets to their maximum potential. The first step in achieving this is operating the existing LNG plants at their maximum capacity [1]. Beyond that, there are economic incentives in debottlenecking the existing LNG plants to increase their capacity. There are various options available to perform the debottlenecking of existing plants. The evaluation and selection of the best options to increase the plant capacity are important for optimum return on the investment. This paper discusses the methodology utilized to debottleneck LNG plants based on ConocoPhillips Optimized Cascade? Process*. An overall plantwide simulation model is used as one tool to perform the evaluation and optimization of the various debottleneck options.
机译:利用现有的天然气资产对其最大潜力进行了重大重点。实现这一目标的第一步是在其最大容量下操作现有的LNG工厂[1]。除此之外,脱果植物的现有液化天然气工厂有经济激励措施,以提高其能力。有各种可供选择现有植物的脱位型选项。增加植物能力的最佳选择的评价和选择对于最佳投资回报是重要的。本文讨论了基于Conocophillips优化级联的Debottleeneck LNG工厂的方法?过程*。整体植物仿真模型用作一个工具,以执行各种脱果蛋白选项的评估和优化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号