首页> 外文会议>International heavy haul conference >Increased Axle Loading and Speeds on the Sishen-Saldanha Iron Ore Export Line in South Africa
【24h】

Increased Axle Loading and Speeds on the Sishen-Saldanha Iron Ore Export Line in South Africa

机译:在南非的Sishen-Saldanha铁矿石出口线上增加了轴装载和速度

获取原文

摘要

Eighteen months after increasing the axle loadings from 26t to 30t on the 863 km iron export line (1067 mm gauge) rapid track degradation was reported. Slacks and crushed ballast resulted from dipped butt welds. Track Technology carried out extensive strain measurements to determine the maximum dips permitted. Tests were done at different speeds and with resilient rail pads. A dip trolley measurement car was developed and measurements taken before every grinding cycle. A mechanical semafir was modified to replace measurements of dips by straight edge and feeler gauges. Results were used to determine dip growth. Top of rail profile was determined with geometry measurement car. Increased speeds are now evaluated and expected increased maintenance cost.
机译:在863 km铁输出线(1067毫米仪表)上增加26t至30t后,将轴载荷从26t到30t增加,报告了速度迅速降解。松弛和碎压载体由浸出的对接焊缝产生。轨道技术进行了广泛的应变测量,以确定允许的最大蘸料。测试以不同的速度和弹性导轨垫进行。在每个研磨循环之前开发和测量的浸车测量车。修改了机械semafir以通过直边和触觉仪更换蘸脐的测量。结果用于确定浸渍生长。用几何测量轿厢确定轨道轮廓。现在评估增加的速度并预期提高维护成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号