Eighteen months after increasing the axle loadings from 26t to 30t on the 863 km iron export line (1067 mm gauge) rapid track degradation was reported. Slacks and crushed ballast resulted from dipped butt welds. Track Technology carried out extensive strain measurements to determine the maximum dips permitted. Tests were done at different speeds and with resilient rail pads. A dip trolley measurement car was developed and measurements taken before every grinding cycle. A mechanical semafir was modified to replace measurements of dips by straight edge and feeler gauges. Results were used to determine dip growth. Top of rail profile was determined with geometry measurement car. Increased speeds are now evaluated and expected increased maintenance cost.
机译:据报道,在863公里的铁出口线(1067毫米规格)上,车轴载荷从26t增加到30t后的18个月,轨道迅速退化。浸入对接焊缝会导致松弛和压碎的压载物。跟踪技术公司进行了广泛的应变测量,以确定允许的最大倾角。测试是在不同的速度下使用弹性垫板进行的。开发了一种浸入式小车测量车,并在每个磨削周期之前进行测量。修改了机械式semafir,以通过直边塞尺和塞尺来代替对倾角的测量。结果用于确定浸出量增长。轨道轮廓的顶部由几何测量车确定。现在评估提高的速度,并期望增加维护成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号