Assessing issues of financing a CO_2 transportation pipeline infrastructure

机译:评估CO_2运输管道基础设施融资的问题

获取原文

摘要

For carbon dioxide capture and geologic storage to be deployed commercially and in a widespread manner will require well thought out approaches for transporting the CO_2 in a pipeline system from the capture facility to the injection site. Establishing a widespread CO_2 transportation infrastructure will require strategic long-term planning, taking into account the potential magnitude of future deployment scenarios for CCS, up to a scale of infrastructure that could be comparable to the scale of oil & gas infrastructure. This paper outlines the results of a study, commissioned by the CO_2 Capture Project (CCP) and completed by Environmental Resources Management (ERM) that evaluated the benefits and risks of two approaches to developing CO_2 pipeline systems. The two basic approaches are described in the paper as: 1. On a point-to-point basis, which matches a specific source to a specific storage location; or 2. Via the development of pipeline networks, including backbone pipeline systems, which allow for common carriage of CO_2 from multiple sources to multiple sinks. An integrated approach to pipeline infrastructure approach offers the lowest average cost on a per ton basis for operators over the life of the projects if sufficient capacity utilization is achieved relatively early in the life of the pipeline. Integrated pipelines also reduce the barriers to entry and are more likely to lead to faster development and deployment of CCS. Without incentives to encourage the development of optimized networks project developers are likely to build point to point pipelines because they offer lower costs for the first movers and do not have the same capacity utilization risk.
机译:对于商业上展开的二氧化碳捕获和地质储存,以广泛的方式将需要仔细考虑将CO_2在管道系统中运输到注射部位的管道系统中的方法。建立广泛的CO_2运输基础设施将需要战略性的长期规划,考虑到CCS未来部署方案的潜在规模,达到可与石油和天然气基础设施规模相当的基础设施规模。本文概述了一项研究的结果,由CO_2捕获项目(CCP)委托,并由环境资源管理(ERM)完成,评估了两种方法的福利和风险到开发CO_2管道系统。纸张中描述了两种基本方法为:1。在点对点的基础上,与特定源与特定存储位置匹配;或者2.通过发布管道网络,包括骨干管道系统,其允许从多个源到多个汇款的CO_2的公共运输。如果在管道生命中相对较早地实现了项目的寿命,则管道基础设施方法的综合方法提供了每吨运营商的平均成本。集成管道还减少了进入的障碍,更有可能导致CCS的开发和部署更快。如果没有激励措施,鼓励优化的网络开发项目开发人员可能会建立点对点的管道,因为它们为第一台搬运工提供了更低的成本,并且没有相同的容量利用风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号