首页> 外文会议>International Conference on Mine Closure >Heat extraction from hypersaline mine water at the Dawdon mine water treatment site
【24h】

Heat extraction from hypersaline mine water at the Dawdon mine water treatment site

机译:Dawdon矿井水处理场所的Hypersaline矿井水热萃取

获取原文

摘要

Mine closure needs to take consideration of the potential wider environmental and economic value of the mine infrastructure and surface environs. An area of growing interest in the exploitation of abandoned mine sites as an economic resource is the heat recoverable from mine waters or as a sink for heat from cooling applications. Mine site restorations and redevelopments can benefit from potentially vast quantities of 'green' heat energy, facilitated by considered mine abandonment (ensuring open shafts remain secure and monitoring recovery of water levels, for example). Pumping of waters, or engineered gravity outflows from mine workings, are often required post-closure to prevent uncontrolled discharges as water levels rebound; in these cases the water source is readily accessible. Alternatively, viable heating schemes may actively abstract mine water, with a specific objective of recovering heat, before discharging it at surface or reinjecting it into the mine.
机译:矿井闭合需要考虑矿井基础设施和地表环境的潜在更广泛的环境和经济价值。对作为经济资源的废弃矿地区剥削兴趣越来越兴趣的领域是从矿山水域中恢复的热量,或者作为冷却应用的热量。矿工部位修复和重建可以从潜在大量的“绿色”热能中受益,通过考虑的矿井遗弃(确保开放轴保持安全和监测水平的恢复)。从矿井工作中泵送水域或工程重力流出,通常需要封闭后,以防止不受控制的排放量作为水位反弹;在这些情况下,水源易于访问。或者,可行的加热方案可以主动抽出矿泉水,在将其放入表面或将其重新注入矿井之前,以恢复热量的特定目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号