首页> 外文会议>International Conference on Mine Closure >Evaluation of reclamation success in Alberta's oil sands
【24h】

Evaluation of reclamation success in Alberta's oil sands

机译:艾伯塔省油砂填海成功的评价

获取原文

摘要

Suncor Energy Inc. 's Reclamation Area #8 (RA8) is an overburden disposal area containing lean oil sands and an average of 3% hydrocarbons. RA8 was reclaimed to an upland ecosite over several stages starting in 1979 and continuing in 1984, 1987 and 1990. Annual monitoring of the site was conducted from 1979 through to 2008. As a result, RA8 is one of the few sites in the Oil Sands Region that provides an example of long-term reclamation performance. Although each portion of the area was reclaimed according to the standards of the day, valuable information is provided on the long-term performance of reclamation using a variety of different preparation and planting strategies. Reclamation approaches included relieving compaction on berms; a peat-mineral reclamation soil cap; breaking up the surface to improve the seedbed; controlling erosion with the planting of annual barley; applying fertiliser and afforestation. Percent cover by species, vegetation height, litter cover and soil samples were evaluated throughout the reclaimed areas.
机译:Suncor Energy Inc.的填海区#8(RA8)是含有贫油砂和3%碳氢化合物的覆盖层处理区。 RA8在1979年开始的几个阶段接收到高地造型,并在1984年,1987年和1990年继续进行。该网站的年度监测是从1979年到2008年进行的。结果,RA8是油砂中的少数遗址之一区域提供长期回收性能的示例。虽然该地区的每个部分是根据当天标准回收的,但是使用各种不同的制备和种植策略来提供有价值的填海的长期性能。填海方法包括缓解巴塞尔斯的压实;泥炭矿物填海帽;分解表面以改善苗床;控制年大麦种植的侵蚀;施肥肥料和造林。通过物种,植被高度,垃圾覆盖物和土壤样品的百分比进行评估,在整个再生区域中评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号