首页> 外文会议>International Conference on Mine Closure >Pond 1 — closure of the first oil sands tailings pond
【24h】

Pond 1 — closure of the first oil sands tailings pond

机译:池塘1 - 封闭第一个油砂尾矿池塘

获取原文

摘要

Since 1966, Suncor's Pond 1 has been operated as part of the shoreline of the Athabasca River in northeastern Alberta, Canada, Perched in this sensitive area, this pond is almost unique in the Canadian landscape and represents a bygone era. Operated as an active pond for over 30 years, Suncor committed to close the pond by 2010 and applied dedicated resources, both technical and operational, to achieve that goal. The challenges associated with closing an oil sands tailings pond were unknown, as it had not been attempted prior to the Pond I efforts. The successful infilling of the pond was completed in 2009, and final surface landforming and revegetation will be complete by the fall of 2010. The reclamation techniques, many used for the first time in oil sands, represent an evolution in reclamation practice over 40 years.
机译:自1966年以来,Suncor的池塘1已作为加拿大东北部艾伯塔省山峰海岸线的一部分,这座池塘在加拿大景观中几乎是独一无二的,代表一个过去的时代。经营为活跃的池塘30多年来,苏米尔致力于将池塘关闭2010年,并应用专门的资源,技术和运营,实现这一目标。与闭合油砂尾矿池有关的挑战是未知的,因为它在池塘之前没有尝试过。池塘的成功缺陷于2009年完成,最终的表面地貌和再训练将完成2010年秋季。填海工程,许多在油砂中首次使用,代表了40多年来的填海工程中的演变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号