首页> 外文会议>International Conference on Mine Closure >Progressive closure planning at the Magellan Mine-providing some certainty in uncertain times: a case study
【24h】

Progressive closure planning at the Magellan Mine-providing some certainty in uncertain times: a case study

机译:在麦哲伦矿地区的渐进式关闭规划 - 在不确定时代提供一些确定性:一个案例研究

获取原文

摘要

Closure planning in the mining industry has been typically left until near the end of mine life, often leaving little time, financial provision or resources for effective closure planning and implementation. Ideally proponents would commit resources and time for closure planning from the commencement of operations to optimise financial return through effective planning and enhanced efficiency. Limitations associated with closing a mine in an unplanned manner include inadequate financial provision, substandard and expensive rehabilitation, and limited access to adequate equipment and materials. The lack of time to trial rehabilitation methods, the absence of corporate memory due to personnel departures, coupled with an extended post-closure monitoring and management period, -will all contribute to prolonged tenement relinquishment and continuing liability for proponents.
机译:在矿业生活中的封闭计划通常留下,直到沿着矿山生活结束,往往留下几乎没有时间,金融提供或资源,以获得有效的封闭计划和实施。理想情况下,支持者将通过有效的规划和提高效率来提交资源和时间来完成闭幕计划,以优化财务回报。以无计划方式关闭矿井的限制包括金融提供,不合标准和昂贵的康复,以及对适当设备和材料的有限访问。缺乏时间审判康复方法,由于人员离开而缺乏公司记忆,加上延长的关闭后监测和管理期, - 威廉所有人都有助于延长的特权放弃和对比度持续责任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号