首页> 外文会议>ASCE International Pipelines Conference >Ponce de Leon Combined Sewer System Separation Planning, Design and Construction
【24h】

Ponce de Leon Combined Sewer System Separation Planning, Design and Construction

机译:PONCE DE LEON合并下水道系统分离规划,设计和施工

获取原文

摘要

In a highly developed corridor along Ponce de Leon Avenue in San Juan, Puerto Rico, the Puerto Rico Aqueduct and Sewer Authority (PRASA) have a combined storm water and sanitary sewer collection system that conveys flows into their Puerto Nuevo Wastewater Treatment Plant. To reduce flows and treatment costs, a plan was developed and implemented to separate the storm water and sanitary sewer flows that will minimize disruption to the businesses along the corridor. The existing combined flow channel is approximately 10,700 feet long, located in the center of Ponce de Leon Avenue, which runs through a mainly business and commercial area within a heavily congested arterial. There are three one-way traffic lanes and a dedicated one-way bus lane. Many of these banks, governmental and private office buildings, will experience disruption during construction activities, so the new sanitary sewer lines had to be carefully planned to minimize impacts to traffic and to the local businesses.
机译:在San Juan的Ponce de Leon Avenue的高度发达的走廊中,波多黎各渡槽和下水道管理局(PRASA)拥有一个综合风暴水和卫生下水道收集系统,传送到他们的波多黎各废水处理厂。为了减少流量和治疗成本,制定并实施计划,以将风暴水和卫生下水道流分离,以最大限度地减少对走廊的业务的干扰。现有的组合流动通道约为10,700英尺长,位于庞塞德利昂大道的中心,该大道主要经营,经过一个主要拥挤的动脉内的商业和商业区。有三个单向交通车道和专用的单向公交车道。许多这些银行,政府和私人办公楼,将在施工活动中经历中断,因此必须仔细计划新的卫生下水道线,以尽量减少对交通和当地企业的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号