首页> 外文会议>IADC/SPE Asia Pacific Drilling Technology Conference >Field Implementation of Sub-Surface Waste Injection: An Integrated Approach for Field Disposal Perspective
【24h】

Field Implementation of Sub-Surface Waste Injection: An Integrated Approach for Field Disposal Perspective

机译:子表面废物注射的现场实施:现场处置视角的综合方法

获取原文

摘要

As the world faces new challenges to protect the environment from all human-generated wastes, self-imposed industry policies as well as governmental regulations support new green policies towards implementing best, not necessarily least costly, practices to prevent any environmental damage due to spillage during operations. Waste Injection (WI) has been selected as the preferred methodology of final disposal of oilfield wastes, including cuttings, produced water, drilling fluids and tank bottoms, etc., by many operators and legislators because it achieves zero discharge in a safe and efficient manner at a lesser operating cost than comparable proven technologies. This may be particularly true for large-scale projects. Mexico, Argentina, Azerbaijan, USA, UK, Norway, Russia and other countries have strategically implemented WI operations in field developments because they comply with local laws and they avoid future liabilities as wastes are permanently isolated and stored below surface. The development and implementation of such technology in large-scale projects is carefully designed using a risk-based analysis that is comprised of fracturing studies of the area of injection, technologies integration, logistics, equipment specification and process monitoring, all with the aim of performing a seamless and risk-free operation. The following paper addresses planning and implementation methodology for WI operations with real examples that demonstrate the value of proper preparation and integration of various technologies to attain maximum efficiency under QHSE standards.
机译:由于世界面临着保护环境的新挑战,保护环境免受所有人类生成的废物,自我强加的行业政策以及政府法规支持新的绿色政策,以实现最佳,不一定是最低成本,防止由于溢出期间的任何环境损害的做法操作。废物注射(WI)被选为油田废物最终处理的首选方法,包括扦插,生产的水,钻井液和罐底部等,因为它以安全有效的方式达到零放电以比可比较的经过可验证的技术的较小的运营成本。对于大型项目来说,这可能尤其如此。墨西哥,阿根廷,阿塞拜疆,美国,英国,挪威,俄罗斯和其他国家在战略上实施了WI战区的行动,因为他们遵守当地法律,而且避免了作为废物永久隔离并储存在表面下方的未来负债。在大规模项目中的开发和实施是使用基于风险的分析进行了精心设计的,该技术包括对注射器领域的压裂研究,技术集成,物流,设备规范和过程监控,所有这些都是表演的无缝和无风险的操作。以下论文解决了WI操作的规划和实施方法,具有实际示例,该实例展示了适当的准备和整合各种技术的价值,以获得QHSE标准的最大效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号