HCC (Hindustan Construction Co. Ltd) has been a leading construction industry in India since 1926. For about 80 years, HCC has led the way in engineering construction. The company has made landmark contributions in the field of Power, Water, Transportation, Tunneling, Environmental engineering and Industrial Construction. HCC exceeds in undertaking all types of large Civil engineering and Infrastructure projects, and has the capability in Engineering and design Research and development Procurement Construction and commissioning Operation and maintenance Project management HCC has innovated new method of lining of temporary river diversion channels. Temporary river diversion work is a very important part of all river valley projects. The river is required to be diverted so as to facilitate the construction of the hydraulic structure, like dam or barrage, across the valley in the course of project execution. In most of the projects, diversion through an open channel is the easiest and most economical option. The diversion channels are designed and constructed for a functional period of 1 to 3 years depending upon the type and size of the project. These channels are required to carry monsoon and non-monsoon river discharge safely without hampering or endangering construction activity. Construction of diversion channels is carried out in non-monsoon lean flow period. Large quantity of excavation is required to be done which consumes major part of available time leaving very short time period for execution of lining work. Traditionally, diversion channels are lined with (rip rap) boulders, 600 to 800 mm thick, in concrete ribs. Well graded sand filter of thickness varying from 300 to 600 mm is provided below the boulders. Collection of large quantity of boulders, its transportation to the site and stacking in a very short time frame involves unavoidable delays and higher costs. In some cases, like the one faced by HCC at Teesta hydro-electric project, the unavailability of the boulders itself was the bottleneck in lining constructing. Considering the constraints associated with this traditional design, a need was felt to develop an economical, speedy and reliable method of lining. Geo-Textile Sand Container Mattresses (GSCM) Lining was conceived, designed and installed for the Teesta IV Hydro electric project by HCC. The paper discusses the design approach, adoption of design for different soil conditions, construction methodology, performance review (over a short time period) and economics of the GSCM lining.
机译:HCC(印度汽车建筑有限公司)自1926年以来一直是印度领先的建筑业。大约80年来,HCC领导了工程建设。该公司在电力,水,运输,隧道,环境工程和工业建设领域作出了地标贡献。 HCC超出了所有类型的大型土木工程和基础设施项目,拥有工程和设计研发采购的能力,采购采购和调试运营和维护项目管理HCC创新了临时河流转移渠道的新方法。临时河流转移工作是所有River Valley项目的一个非常重要的部分。需要转移河流,以便于在项目执行过程中促进液压结构的建造,如大坝或拦截。在大多数项目中,通过开放频道的转移是最简单,最经济的选择。转移通道根据项目的类型和大小设计和构造,为1至3年的功能期。这些频道必须安全地承载季风和非季风河流放电,而不会妨碍或危及施工活动。导流频道的构造是在非季风贫流期中进行的。需要进行大量的挖掘,以便消耗可用时间的主要部分,留下非常短的时间段以执行衬里工作。传统上,转移通道衬有(RIP RAP)巨石,600至800毫米厚,在混凝土肋中。厚度从300到600 mm的厚度较大的良好灰尘过滤器设置在巨石下方。大量巨石集合,其运输到站点并在很短的时间内堆叠涉及不可避免的延误和更高的成本。在某些情况下,就像HCC在Teesta水电项目面临的那样,巨石本身的不可用是衬里构造的瓶颈。考虑到与这种传统设计相关的限制,感受到一种经济,快速和可靠的衬里方法。通过HCC为Teesta IV水电项目设计和安装了地理纺织砂容器床垫(GSCM)衬里。本文讨论了设计方法,采用不同土壤条件,施工方法,绩效审查(在短时间内)和GSCM衬里的经济学。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号