首页> 外文会议>HydroVision 2008 conference technical papers >Geo-Textile Sand Container Mattresses (GSCM) Lining for Temporary River Diversion Channels
【24h】

Geo-Textile Sand Container Mattresses (GSCM) Lining for Temporary River Diversion Channels

机译:临时分流河道的土工纺织沙子集装箱床垫衬里

获取原文
获取原文并翻译 | 示例

摘要

HCC (Hindustan Construction Co. Ltd) has been a leading construction industry in India sincern1926. For about 80 years, HCC has led the way in engineering construction. The company hasrnmade landmark contributions in the field of Power, Water, Transportation, Tunneling,rnEnvironmental engineering and Industrial Construction. HCC exceeds in undertaking all types ofrnlarge Civil engineering and Infrastructure projects, and has the capability inrnEngineering and design Research and developmentrnProcurement Construction and commissioningrnOperation and maintenance Project managementrnHCC has innovated new method of lining of temporary river diversion channels. Temporaryrnriver diversion work is a very important part of all river valley projects. The river is required to berndiverted so as to facilitate the construction of the hydraulic structure, like dam or barrage, acrossrnthe valley in the course of project execution. In most of the projects, diversion through an openrnchannel is the easiest and most economical option.rnThe diversion channels are designed and constructed for a functional period of 1 to 3 yearsrndepending upon the type and size of the project. These channels are required to carry monsoonrnand non-monsoon river discharge safely without hampering or endangering construction activity.rnConstruction of diversion channels is carried out in non-monsoon lean flow period. Largernquantity of excavation is required to be done which consumes major part of available timernleaving very short time period for execution of lining work.rnTraditionally, diversion channels are lined with (rip rap) boulders, 600 to 800 mm thick, inrnconcrete ribs. Well graded sand filter of thickness varying from 300 to 600 mm is provided belowrnthe boulders. Collection of large quantity of boulders, its transportation to the site and stackingrnin a very short time frame involves unavoidable delays and higher costs. In some cases, like thernone faced by HCC at Teesta hydro-electric project, the unavailability of the boulders itself wasrnthe bottleneck in lining constructing.rnConsidering the constraints associated with this traditional design, a need was felt to develop anrneconomical, speedy and reliable method of lining. Geo-Textile Sand Container Mattressesrn(GSCM) Lining was conceived, designed and installed for the Teesta IV Hydro electric projectrnby HCC.rnThe paper discusses the design approach, adoption of design for different soil conditions,rnconstruction methodology, performance review (over a short time period) and economics of thernGSCM lining.
机译:自1926年以来,HCC(印度建筑有限公司)一直是印度领先的建筑行业。大约80年来,HCC在工程建设方面一直处于领先地位。该公司在电力,水,运输,隧道,环境工程和工业建筑领域做出了具有里程碑意义的贡献。 HCC承接了各种类型的大型土木工程和基础设施项目,并具有工程设计能力,研发设计,采购建设和调试,运营与维护项目管理能力。HCC创新了临时引水渠道衬砌的新方法。临时河道改道工作是所有流域项目的重要组成部分。在执行项目的过程中,需要对河流进行分流,以便于在山谷中修建水坝或拦河坝等水力结构。在大多数项目中,通过露天渠道进行分流是最简单,最经济的选择。根据项目的类型和规模,分流渠道的设计和建造的有效期为1-3年。这些通道需要安全地进行季风河和非季风河的排放,而不会妨碍或危害施工活动。导流河道的施工在非季风稀流期进行。需要进行大量开挖,这会占用可用时间的大部分时间,从而使衬砌工作的执行时间非常短。传统上,导流渠衬有600至800毫米厚的不规则混凝土肋骨(裂石)。巨石下方设有厚度从300到600毫米不等的分级良好的砂滤器。收集大量巨石,将其运到现场并在很短的时间内堆放会不可避免地导致延误和更高的成本。在某些情况下,例如Teesta水电项目的HCC面临的龙卷风,巨石本身的不可用是衬砌施工的瓶颈。考虑到传统设计的局限性,人们认为有必要开发一种经济,快速且可靠的方法衬垫。 HCC的Teesta IV水电项目构思,设计和安装了土工织物沙子集装箱床垫衬里。本文讨论了设计方法,针对不同土壤条件的设计采用,施工方法,性能评估(短时间内)期)和GSCM衬砌的经济性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号