Construction Practice of CFRD of Upper ReserVoir of Yixing Pumped-storage Power Plant

机译:宜兴泵蓄能电厂上水库CFRD的施工实践

获取原文

摘要

The main dam of the upper reservoir of Yixing Pumped-storage Power Plant, as areinforced concrete faced rock-filled dam built on the tilted foundation surface, is rare at homeand abroad in its type whose stress and deformation traits are in accordance with the general law. The deformation of upper reservoir of the main dam of Yixing Pumped-storage Power plant issmaller in all CFRD in China, and the amount of the impervious faceplate cracks is less than thatof the same type project, it shows that the design of main dam is reasonable and advanced, andthe construction is high quality.
机译:宜兴泵蓄能电厂上层储存器的主坝,如倾斜基础表面上的弯曲混凝土面对岩石填充坝,其类型的伴者在国外罕见,其应力和变形性质符合总法。在中国所有CFRD的宜兴泵浦蓄电电厂Issmaller主坝上大坝上层的变形,不透水面板裂缝的数量小于同一型项目,表明主坝的设计是合理的先进,建设是高质量的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号