This paper presents results from an application of the GenAVC active network management system to a generation project which required an existing 2 MW connection to be increased to 3 MW. Initial studies by the distribution network operator (DNO), EDF Energy Networks, indicated that the increase was not possible due to voltage rise limitations. Active network management in the form of a GenAVC system was installed on the network. The results demonstrate how GenAVC is able to adjust the substation voltage to allow 3 MW of generation while maintaining all voltages within limits. An assessment tool is also described which enables DNOs to assess the potential benefits of GenAVC before commencing a project.
机译:本文提出了Genavc主动网络管理系统的应用程序,该生成项目需要现有的2 MW连接增加到3 MW。分销网络运营商(DNO),EDF能量网络的初步研究表明,由于电压上升限制,不可能增加。在网络上安装了Genavc系统形式的主动网络管理。结果表明,Genavc如何能够调整变电站电压,以允许3 MW的产生,同时保持限制内的所有电压。还描述了一种评估工具,其使DNO能够在开始项目之前评估Genavc的潜在益处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号