首页> 外文会议>DISTRIBUTECH Conference Exhibition >Centralized Remedial Action Scheme (C-RAS) using Emerging Telecommunication, Protection Technologies, and OSIsoft PI - (PPT)
【24h】

Centralized Remedial Action Scheme (C-RAS) using Emerging Telecommunication, Protection Technologies, and OSIsoft PI - (PPT)

机译:使用新兴电信,保护技术和oSOnoft pi - (ppt)的集中式补救措施方案(C-RAS)

获取原文

摘要

Congested transmission corridors/network - Ever increasing customer load growth Long lead time to build transmission - Transmission lagging generation and customer load growth Integration of new generators including renewables into the transmission network - Uncertainty on new generation siting/locations - Legislative/regulatory renewable targets mandate Increasing transmission voltage support requirements Extensive use of "Remedial Action Schemes (RAS)."
机译:拥挤的传输走廊/网络 - 越来越多的客户负荷增长长期提前时间打造传输 - 传输滞后生成和客户负荷增长集成新的发电机,包括可再生能源进入传输网络 - 新一代选址/地点的不确定性 - 立法/监管可再生目标授权增加传输电压支持要求广泛使用“补救动作方案(RAS)”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号