首页> 外文会议>SMTA International Technical Conference >A CASE STUDY ON PROCESS IMPROVEMENTS FOR VAPOR PHASE REWORK ON HIGH THERMAL MASS SMT CONNECTOR
【24h】

A CASE STUDY ON PROCESS IMPROVEMENTS FOR VAPOR PHASE REWORK ON HIGH THERMAL MASS SMT CONNECTOR

机译:高热质量SMT连接器气相返工过程改进的案例研究

获取原文

摘要

Rework of high thermal mass SMT connectors is challenging and requires use of vapor phase reflow technology. Vapor phase rework on a local vapor phase machine is well suited for this type of repair and offers benefits over conventional convection rework. However, local vapor phase requires longer rework times and manual operator intervention at critical points during the rework cycle which present opportunity for process improvements. Hardware machine updates, software updates and process automation resulted in cycle time reductions of 25% for connector removal and 40% for connector replacement. Error-proofing to remove process variance, additional safety features and reduction in chemical consumption were also achieved.
机译:高热质量SMT连接器的返工具有挑战性,需要使用气相回流技术。局部气相机上的气相返工非常适合这种类型的维修,并提供对传统对流返工的好处。然而,局部蒸汽阶段需要更长的返工时间和手动操作员干预在返工周期期间的关键点,这些返工周期提供过程改进的机会。硬件机器更新,软件更新和过程自动化导致连接器拆卸的循环时间为25%,连接器更换为40%。还达到了误差以消除流程方差,还实现了额外的安全特征和化学品消耗的减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号