首页> 外文会议>Power Plant Air pollutant Control "MEGA" Symposium >Assessment of Greenhouse Gas Retrofit Issues for Coal Fired Power Plants
【24h】

Assessment of Greenhouse Gas Retrofit Issues for Coal Fired Power Plants

机译:燃煤电厂温室气体改造问题评估

获取原文

摘要

Several studies have been conducted that independently address CO_2 capture processes. However, very few of these studies have considered the total impact of the capture process on existing coal power plants including potential improvements that could optimize the CO_2 capture process. This paper will provide insight into the overall modifications that should be performed before a CO_2 capture process is installed at an existing power plant. Existing air pollution control systems are analyzed to determine enhancements that would be required to provide adequate flue gas quality for a future CO_2 capture process. Evaluations are conducted on the secondary discharge and treatment options that will be required once the CO_2 capture process is installed. The balance of plant impacts are also reviewed with an emphasis on the impact on air quality control systems. The study also investigates natural resource requirements such as additional plot space and increased water consumption.
机译:已经进行了几项研究,其中独立地解决了CO_2捕获过程。然而,很少有研究已经考虑了捕获过程对现有煤发电厂的总影响,包括可以优化CO_2捕获过程的潜在改进。本文将深入了解应在现有电厂安装CO_2捕获过程之前进行的整体修改。分析现有的空气污染控制系统以确定为未来CO_2捕获过程提供足够的烟道气质量所需的增强功能。一旦安装了CO_2捕获过程,评估就在辅助放电和治疗方案上进行了评估。还综述了植物影响的平衡,重点是对空气质量控制系统的影响。该研究还调查了自然资源要求,如额外的绘图空间和增加的耗水量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号