首页> 外文会议>Canada-U.S. Rock Mechanics Symposium >ARMA 09-50 Foundation Investigations for Refurbishment Cut-off Walls at Arapuni Dam, New Zealand
【24h】

ARMA 09-50 Foundation Investigations for Refurbishment Cut-off Walls at Arapuni Dam, New Zealand

机译:Arma 09-50新西兰Arapuni大坝翻新切断墙的基础调查

获取原文

摘要

Arapuni Dam, a 64 m high curved concrete gravity structure founded on Quaternary-age ignimbrites, has experienced several seepage flow incidents since its construction between 1925 and 1927. After grouting of the latest flow in 2001, the longer-term future performance of the dam was investigated by triple-tube coring of the foundations, laboratory strength testing, weir and piezometer monitoring of responses to induced changes in pressures in the foundations, and characterization of water chemistry and isotope signatures as well as temperature. The paper describes the use of these techniques to identify four subvertical zones (fissures) controlling the pattern of foundation seepage along joints formed in the Ongatiti Ignimbrite, many of which were either open or infilled with erodible nontronite clay. Recognition of the four fissure zones has enabled the design and construction of four discrete 90 m high cut-off walls through the dam and into its foundations, rather than treatment across the whole dam foundation.
机译:Arapuni大坝,一台64米的高弯曲混凝土重力结构,成立于第四纪Ignimbrites,自1925年至1927年间的建设以来经历了几种渗流流动事件。在2001年的最新流程灌浆后,大坝的长期未来表现由基础,实验强度试验,堰和压阻计监测对诱导的基础变化以及水化学和同位素签名以及温度的表征以及温度的表征的研究。本文描述了使用这些技术来识别控制沿着在Ongatiti Ignimbrite中形成的接头的基础渗流的四个颠覆区域(裂缝),其中许多是用易于侵蚀的非巨石粘土开放或indIng。识别四个裂隙区域使设计和构造四个离散的90米高的截止墙体通过大坝并进入其基础,而不是整个大坝基础的处理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号