首页> 外文会议>UITP Metro Conference >Gaining Experience with Disneyland Resort Line - Preparing for Complete Automation of Network
【24h】

Gaining Experience with Disneyland Resort Line - Preparing for Complete Automation of Network

机译:获得迪士尼乐园的经验 - 准备网络的完整自动化

获取原文

摘要

Automation enables train service regulation to be more responsive to customer demand by optimized provision of train paths and speedier service recovery after perturbations. Automation will also lead to energy saving from better regulated train service and improved train running profile and staff cost saving. This paper describes the drivers for Fully Automatic Operation (FAO) for MTR Corporation and shares our experience from operating Disneyland Resort Line (DRL), our first railway line built to fully automatic operation. DRL is 3.5 km in route length and was commissioned for operation in 2005 to match the opening of the Hong Kong Disneyland theme park. DRL has prepared the Corporation for more extensive network automation.
机译:自动化使火车服务规范能够更加响应于客户需求,通过优化在扰动后提供火车路径和更快的服务恢复。自动化还将导致从更好的监管列车服务和改进的火车运行型材和员工节省节能的节能。本文介绍了用于MTR Corporation的全自动操作(粮农组织)的驱动因素,并分享了我们从经营迪士尼乐园(DRL)的经验,我们的第一条铁路线构建为全自动操作。 DRL在路线长度3.5公里,于2005年委托运营,以匹配香港迪士尼乐园主题公园的开幕。 DRL已经为公司提供了更广泛的网络自动化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号