首页> 外文会议>Conference on Cybernetics and Intelligent Systems >A Economic Lot Scheduling Problem for Manufacturing and remanufacturing
【24h】

A Economic Lot Scheduling Problem for Manufacturing and remanufacturing

机译:制造和再制造的经济性调度问题

获取原文

摘要

Recently, remanufacturing has received more and more attention by many manufacturers. It is economical to schedule manufacturing and remanufacturing on the same single product line due to setup cost saving. In this paper, we extend the classical Economic Lot Scheduling Problem to schedule the manufacturing and remanufacturing on the same single product line. We assume that the demand rate and return rate are constant and the product line has limited capacity of manufacturing and remanufacturing. We employ the Common Cycle approach to coordinate manufacturing with remanufacturing such that the total cost of per unit time is minimized. Furthermore, many numerical examples are presented to show the effects of return rate on the performance of this manufacturing/remanufacturing hybrid system.
机译:最近,许多制造商的再制造已经获得了越来越多的关注。由于设置成本节省,在同一单一产品线上安排制造和再制造是经济的。在本文中,我们延长了经典的经济性调度问题,以安排在同一产品线上的制造和再制造。我们假设需求率和返回率是恒定的,产品系列具有有限的制造能力和再制造能力。我们采用共同的循环方法来坐标,以再制造,使得每单位时间的总成本最小化。此外,提出了许多数值例子以显示回速对该制造/再制造混合系统的性能的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号