【24h】

U-Worker Scheduling System: A Case Study at KT

机译:U-Worker Scheduling System:KT案例研究

获取原文

摘要

In a telecom, field workers visit many customer sites to provide services and repair faults. Scheduling the workers is hard because there are many tasks and the number of the workers is not sufficient. To tackle this problem, KT had transformed the field workers into ubiquitous workers and used work team based scheduling system. However, this approach was not sufficient to reduce frequent worker's arrival time changes and to increase operational efficiency. Therefore, we proposed individual worker scheduling system for managing the worker's schedule efficiently. We also developed an optimal worker selection algorithm based on statistical information when an operator assigns a task to the worker.
机译:在电信中,现场工人访问许多客户网站提供服务和修复故障。安排工人很难,因为有许多任务和工人的数量不够。为了解决这个问题,KT已经将现场工人转变为普遍存在的工人,并使用了基于工作团队的调度系统。然而,这种方法不足以减少频繁的工人到达时间变化并提高运营效率。因此,我们提出了有效地管理工人的计划的个人工人调度系统。当操作员为工作人员分配任务时,我们还开发了一种基于统计信息的最佳工作者选择算法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号