首页> 外文会议>Reliability Maintenance Conference >Assessing the Value Creation of RBI
【24h】

Assessing the Value Creation of RBI

机译:评估RBI的价值

获取原文

摘要

The application of risk-based inspection can generate value for an operating company in a number of ways. However, all of the value generated with RBI can generally be divided into two broad categories: · Reduction in Risk (including the business risk of lost production) or · Cost Reductions Cost reductions are generally easier to quantify and measure, but understanding and properly managing the risk reduction generally provides greater value. Risk reduction is often considered a "soft" number, and if an equipment failure is prevented it is difficult to take credit for the risk reduction. This paper will describe how value creation can be predicted before the application of RBI, and how it can be measured during the implementation and sustaining of the process. A case study is presented from the DuPont Sabine River Works Ethylene Plant. The value analysis was completed at the start of the RBI Implementation effort in 2002, and costs and risk reduction have been tracked for five years. As anticipated, the RBI program has created significant value in both inspection and maintenance cost reductions and in risk reduction.^
机译:基于风险的检验的应用程序可以通过多种方式生成一个运营公司的价值。但是,与RBI产生的价值一般可以分为两大类:·减少风险(包括损失的生产经营风险),或·降低成本,降低成本通常比较容易量化和测量,但认识和妥善管理风险降低通常提供更大的价值。降低风险通常被视为一种“软”号码,如果能避免设备出现故障,很难采取信贷风险降低。本文将描述如何创造价值可以打点的应用程序之前进行预测,以及它如何执行期间进行测量和处理的维持。以苏州为例,从杜邦萨宾河工程乙烯装置呈现。价值分析是在打点执行工作开始于2002年结束,而成本和减少风险已经跟踪五年。正如预期的那样,打点程序创建的检查和维护成本的降低都和降低风险显著的价值。^

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号