首页> 外文会议>SPE Latin American and Caribbean Petroleum Engineering Conference >Shallow Horizontal Drilling Meets with Very Extended Reach Drilling in the Venezuelan Faja
【24h】

Shallow Horizontal Drilling Meets with Very Extended Reach Drilling in the Venezuelan Faja

机译:浅水钻井钻井们在委内瑞拉法国委内瑞拉的钻井钻孔

获取原文

摘要

Early in the 1990s,Venezuela accelerated drilling and production of the Orinoco oil belt called“La Faja.” Since then,thousands of horizontal wells have been drilled.Despite the giant reserves in the highly porous and permeable sands found in the Faja,low reservoir pressure and heavy oils with reduced crude API require that reservoir exposure for production is maximized.Because of this,longer horizontal sections are being drilled and will continue to be drilled in the Faja. Drilling of the Faja started in reservoirs of true vertical depths(TVD)from 2,500 ft to 4,000 ft; however,as the development of the Orinoco belt has moved towards the south,reservoirs in the last 5 years have been drilled at TVDs from 1,500 ft to 2,500 ft.Further development,in the last 2 years,of the southern Faja has required drilling reservoirs at TVDs from 1,200 ft to 1,500 ft.Drilling horizontal wells at these shallow TVDs requires adequate planning and execution because of the inherent risks of high dogleg severity,cyclic stress of bottomhole components,high torque and drag,poor hole cleaning, inadequate weight-on-bit transfer,pipe swaps,wiper trips,and stuck pipe events.To maximize reservoir exposure,recent advances in extending horizontal lengths of these shallow wells have also been achieved. A few wells drilled in south Faja in 2013 fit the very extended reach drilling classification as defined by the oil industry because of their 1:4 stepout ratio,the ratio of true vertical depth versus horizontal displacement. Along with the evolution of shallow horizontal and extended reach drilling,advances in surface pads and trajectory design,bottomhole assemblies(BHAs),drilling practices,directional drilling tools,and advanced geosteering techniques have allowed drilling extended reach wells of longer total depth with reduced nonproductive time,enabling increasing oil production in the Faja.Experience in the execution of shallow horizontal ERD wells has led to the consolidation of lessons learned and capture of best practices which will be key to improving drilling along the extensive southern area of the Faja,where reservoirs even shallower than 1,100 TVD are found.
机译:在20世纪90年代初期,委内瑞拉加速钻探和生产奥里诺柯油带,称为“La Faja”。此后,几千水平井已经drilled.Despite巨储备在法亚发现高度多孔且可渗透的砂,低储层压力和重油具有降低粗API要求储曝光生产是本maximized.Because,正在钻出更长的水平部分,并将在FAJA中继续钻探。 Faja的钻井开始于真正的垂直深度(TVD)的水库,从2,500英尺到4,000英尺;然而,由于奥里诺科带的发展已经走向南方,过去5年的水库已经在TVDS中钻探从1,500英尺至2,500英尺到2,500英尺的FT.Further开发,在过去2年中,南部的Faja需要钻井水库在TVDS从1,200英尺到1,500英尺到1,500英尺的水晶井,在这些浅层TVDS需要足够的规划和执行,因为高斗沟严重程度的固有风险,底孔部件的循环应力,高扭矩和阻力,孔清洁不足,负重不足-Bit转移,管道掉刮刮刮刮刮板和卡住管道事件。为了最大化水库曝光,还实现了延长这些浅井水平长度的最新进展。 2013年在南法国钻的几个井展示了石油工业所规定的延长达到钻探分类,因为它们为1:4节奏比,真正的垂直深度与水平位移的比率。随着浅水平和延长钻探的演变,表面垫和轨迹设计的进步,井底组件(BHAS),钻孔实践,定向钻孔工具和先进的地升技术,允许钻探延伸到较长的总深度的井,具有减少的非培养时间,使得Faja中的石油产量增加。在执行浅水井中的执行中的经验导致了巩固经验教训和捕获最佳实践,这将是改善Faja广泛南部地区的钻井的关键,其中包括水库甚至发现比1,100次浅。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号