【24h】

Exploration and Appraisal Drilling Operations in the South Atlantic

机译:南大西洋勘探与评估钻探运营

获取原文

摘要

The paper describes how the teamwork and continuity provided by utilising a drilling project management company based in Aberdeen and a single drilling contractor enabled two small UK operating companies, with limited in-house operational resources, to conduct offshore drilling campaigns in an area remote from established support centres. It will summarise the geological conditions encountered in the North Falklands Basin and discuss the drilling engineering and well planning. It will also discuss the importance of the logistics planning and supply chain management, which included the enhancement of limited onshore support facilities in Port Stanley and the introduction of industry standard safe operating procedures. The paper will also review the day to day drilling operations and interaction with the local authorities. On Saturday 17 March 2012, the Ocean Guardian semi-submersible drilling unit returned to Invergordon on the Cromarty Firth at the end of an 8000 mile ocean tow from the South Atlantic. The rig left the firth in November 2009 to make the journey south, arriving on its first location north of the Falkland Islands in February 2010. In the intervening period it successfully worked for three different operators, drilling nine exploration wells (including one in the southern basin) and seven appraisal wells, two of which were tested, discovering and delineating the Sea Lion oil field. Water depths, with the one exception in the southern basin, were up to 450m. The paper will demonstrate that with detailed and careful planning, inclusive management and modern communications technology, drilling operations in remote locations can be conducted safely and efficiently.
机译:本文介绍了如何利用基于阿伯丁的钻井项目管理公司提供的团队合作和连续性,该公司拥有两个小英国运营公司,内部运营资源有限,可以在远程落实的地区进行离岸钻探活动支持中心。它将总结北福克兰盆地遇到的地质条件,并讨论钻井工程和井规划。它还将讨论物流规划和供应链管理的重要性,其中包括在斯坦利港口的有限境内支持设施的增强以及行业标准安全操作程序的引入。本文还将审查日常钻探运营和与地方当局的互动。 2012年3月17日星期六,海洋监护人半潜水钻井装置在南大西洋的8000英里海洋丝束结束时返回克罗马蒂峡谷。该钻机于2009年11月离开了火星,以便南方的旅程,到2010年2月抵达福克兰群岛北部的第一场位置。在中期期间,它成功地工作了三个不同的运营商,钻了九个勘探井(包括南部的一个盆地)和七个评估井,其中两个是测试的,发现和描绘海狮油田。水深,南部盆地的一个例外,高达450米。本文将证明,通过详细和仔细的规划,包容性管理和现代通信技术,可以安全有效地进行远程位置的钻井业务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号