首页> 外文会议>SPE Annual Technical Conference and Exhibition >Integrated Well Integrity Cement Evaluation Technique for Shallow Gas Flow Cementing in Eagle Ford Field
【24h】

Integrated Well Integrity Cement Evaluation Technique for Shallow Gas Flow Cementing in Eagle Ford Field

机译:鹰福田浅气流井井井综合整合水泥评价技术

获取原文

摘要

Cement job design has historically been a static process largely independent of the other processes in the drilling and completion phases.The success or failure of achieving zonal isolation,which is the main objective of cementing,is usually attributed to the cement placement result without analyzing in details various factors such as drilling parameters,borehole shape,drilling fluid properties,casing designs,formation properties(temperature and pressure profiles),and even cement evaluation methods including post-cement placement activities that could contribute to the end result of achieving zonal isolation objectives for long-term well integrity on an oil and gas well.A unique workflow is developed by incorporating data from different stages of the well construction process(drilling,cementing and cement evaluation)to optimize the cement job design and placement evaluation for critical and challenging wells.By integrating real-time or near real-time data from drilling and cementing phases,the unique workflow rapidly identifies critical information that can prevent poor cement placement,which allows operators to make timely decision to achieve well integrity and safe working environment.An integration of drilling and openhole information,cement slurry design and placement/mud removal result,and cement evaluation log evaluation is required to better understand zonal isolation and well integrity,particularly for wells with shallow hazards.This case study explains an integrated workflow implemented during cement placement design and evaluation on surface casing cementing job after failure of a conventional cement barrier placement in the Eagle Ford field in south Texas.
机译:水泥工作设计历来是一个静态的过程很大程度上独立于钻井和完井phases.The成败实现区域隔离,这是水泥的主要目标,其他过程的通常归因于水泥后的结果,而不分析细节上的各种因素,如钻井参数,井眼形状,钻井液性质,套管的设计中,地层特性(温度和压力分布),甚至水泥评价方法,包括后水泥放置活动可能有助于实现区域隔离目标的最终结果对石油和天然气well.A独特的工作流程长期良好的完整性是通过将来自井施工过程中的不同阶段的数据(钻井,固井和水泥评估),以优化关键和挑战固井设计和布置的评估后制定wells.By钻井集成实时或接近实时的数据和固井pH值ASES,独特的工作流程快速识别,可以防止较差的水泥贴片,它使运营商能够及时作出决定,以实现良好的完整性和钻井和裸眼信息,水泥浆设计和安放/泥去除结果的安全工作environment.An整合的关键信息,水泥评价测井评价,需要更好地了解区域隔离和良好的完整性,特别是对于具有浅hazards.This案例井解释了水泥贴片设计和评估上表面时实现的集成工作流套管传统的水泥护栏放置失败后固井在得克萨斯州南部的鹰福特领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号