首页> 外文会议>European Wind Energy Conference and Exhibition >A SUCCESS STORY - MV SUBSEA CABLE SUPPLY AND INSTALLATION AT HORNS REV II OFFSHORE WIND FARM
【24h】

A SUCCESS STORY - MV SUBSEA CABLE SUPPLY AND INSTALLATION AT HORNS REV II OFFSHORE WIND FARM

机译:成功的故事 - MV海底电缆供应和垫圈安装在Heve II海上风电场

获取原文

摘要

Nexans Deutschland has been supplying and installing all MV subsea cables for both, Horns Rev I and Horns Rev II offshore wind farms off the Danish coast. The authors will with the background of his hands-on experience describe the challenges of designing, producing, transporting and installing the MV subsea power cables and their related accessories between the individual turbines and to the transformer platform. Special focus will be given to the importance of detailed planning and preparing for work at this great distance from shore, including offshore training, safety measures and contingencies.
机译:Nexans Deutschland一直在供应和安装所有MV海底电缆,角度转速我和角逆转II海上风电场。作者将在其实践经验的背景下描述设计,生产,运输和安装MV海底电力电缆及其在各个涡轮机和变压器平台之间的相关配件的挑战。将特别焦点在距离岸边的距离,包括离岸培训,安全措施和临时方面的详细规划和准备工作的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号