首页> 外文会议>Society of Petroleum Engineers Asia Pacific Health, Safety,Security and Environment Conference and Exhibition >Integrating People, Plant, and Process ian the Design and Operation of Process Industry Assets
【24h】

Integrating People, Plant, and Process ian the Design and Operation of Process Industry Assets

机译:整合人,植物,加工伊恩工艺行业资产的设计和运作

获取原文

摘要

The fatal explosion at the Texas City Refinery in March 2005, highlights the importance of comprehensively addressing human factors during project design to avoid catastrophic consequences. While many factors contributed to varying degrees to cause the explosion, BP’s response to the explosion included developing a comprehensive procedure and supporting guidance on the integration of human factors with project engineering processes. Other sources of such guidance do exist but they are generic in that they do not map onto an engineering or systems development process. Or they are specific only to certain stages of development. This work is original in its attempt to create a comprehensive solution to oil and gas projects’ development cycle, and in trying to map this onto an operating Company’s management systems. This paper reports on the work undertaken to develop a human factors integration procedure for BP’s projects and operational management. It describes the requirements gathering and drafting phases of the work, and shows how the description of human factors practices has been tailored to the organisation’s established engineering and technical safety management systems. The human factors process model has been validated with stakeholders throughout the organisation and in support of a major project. The results of these validation activities are reported here.
机译:2005年3月德克萨斯城炼油厂的致命爆炸突出了在项目设计期间全面解决人为因素的重要性,以避免灾难性后果。虽然许多因素导致爆炸的不同程度导致爆炸,BP对爆炸的反应包括开发关于与项目工程流程的人类因素的整合的全面程序和支持指导。此类指导的其他来源确实存在,但它们是通用的,因为它们不会映射到工程或系统开发过程中。或者它们仅特定于某些发展阶段。这项工作是原始的,它的尝试为石油和天然气项目的发展周期创建了全面的解决方案,并试图将其映射到运营公司的管理系统。本文报告了开展BP项目和业务管理的人为因素整合程序的工作。它描述了工作的需求和起草阶段,并展示了人类因素实践的描述是如何对本组织的既定工程和技术安全管理系统量身定制的。人为因素流程模型已通过整个组织的利益相关者验证,并支持一个主要项目。在此报告这些验证活动的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号