Keystone Generating Station is a 2 × 850 MW coal-fired generating station located in Plum Creek Township, Armstrong County, near Shelocta, Pennsylvania. The station is currently owned as an undivided interest by seven utilities and is managed and operated by Reliant Energy. After the FGD system goes into service, the units will burn high-sulfur eastern bituminous coal and operate base-loaded with an average annual capacity factor of approximately 90%. The FGD system uses limestone slurry to remove SO{sub}2 and in-situ forced oxidation followed by horizontal belt filters to produce commercial grade gypsum. A waste water treatment system processes the effluent from the FGD system to remove trace elements and solids before discharging. The presentation will include unique features of the system and details of performance requirements including SO{sub}2 removal, particulate emissions, mercury removal, quantity and quality of waste water effluent from the FGD system.
机译:Keystone发电站是一个2×850 MW燃煤发电站,位于佩斯特朗县的梅花溪乡,宾夕法尼亚州Shelocta附近。该站目前由七种公用事业公司拥有不可分割的兴趣,并通过依赖能源进行管理和运营。在FGD系统进入服务之后,单位将燃烧高硫东部沥青煤,并运行底座,平均年度容量系数约为90%。 FGD系统使用石灰石浆料除以所以{Sub} 2和原位强制氧化,然后是水平带滤波器生产商业级石膏。废水处理系统从FGD系统处理流出物,在放电之前除去微量元素和固体。演示文稿将包括系统的独特特征和性能要求的细节,包括来自FGD系统的废水流出物的{sub} 2去除,微粒排放,汞去除,数量和质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号