DESIGN, SPECIFICATION, PROCUREMENT AND UNIQUE FEATURES OF AN FGD SYSTEM WITH WET STACK AND WASTE WATER TREATMENT FOR KEYSTONE GENERATING STATION, UNITS 1 AND 2

机译:1号和2号机组用湿石蜡和废水处理烟气脱硫系统的设计,规格,采购和独特功能

获取原文

摘要

Keystone Generating Station is a 2 × 850 MW coal-fired generating station located in PlumCreek Township, Armstrong County, near Shelocta, Pennsylvania. The station is currentlyowned as an undivided interest by seven utilities and is managed and operated by ReliantEnergy. After the FGD system goes into service, the units will burn high-sulfur easternbituminous coal and operate base-loaded with an average annual capacity factor ofapproximately 90%. The FGD system uses limestone slurry to remove SO_2 and in-situ forcedoxidation followed by horizontal belt filters to produce commercial grade gypsum. A wastewater treatment system processes the effluent from the FGD system to remove trace elementsand solids before discharging. The presentation will include unique features of the system anddetails of performance requirements including SO_2 removal, particulate emissions, mercuryremoval, quantity and quality of waste water effluent from the FGD system.
机译:Keystone发电站是位于Plum的2×850 MW燃煤发电站 宾夕法尼亚州谢洛克塔附近的阿姆斯特朗县克里克镇。该站目前 由七个公用事业公司作为未分割权益拥有,并由Reliant管理和运营 活力。烟气脱硫系统投入运行后,机组将燃烧高硫东部 烟煤并以基本负荷运行,年平均产能因子为 约90%。烟气脱硫系统使用石灰石泥浆去除SO_2并原位强制 氧化,然后用水平带式过滤器生产商用级石膏。浪费 水处理系统处理烟气脱硫系统中的废水以去除微量元素 和固体在排放之前。演示将包括系统的独特功能和 性能要求的详细信息,包括SO_2去除,颗粒物排放,汞 烟气脱硫系统废水的去除,数量和质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号