Wind Generation Interconnection Wickets and Thickets…Navigation Options - (PPT)

机译:风发电互连检票和灌木......导航选项 - (PPT)

获取原文

摘要

Geographic concentration of requests with inadequate transmission …. resulting in upgrade costs that make projects unviable. Requests drop from the queue and require new study assumptions & re-running analysis …. causing delays, changing cost estimates, and cost allocations. Transmission study assumptions that do not account for modern wind generation design capabilities …. can result in very costly and un-necessary required upgrades. Inadequate interconnection policy coordination between FERC and State jurisdictional utilities.
机译:传输不足的请求的地理集中......导致升级成本,使项目不可行。请求从队列中删除,需要新的学习假设和重新运行分析......造成延迟,改变成本估算和成本分配。传输研究假设不考虑现代风发电设计能力......可以导致非常昂贵和无需必要的所需升级。 FERC和国家司法公用事业之间的互连政策协调不足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号