The Initial Design for Roller Compacted Concrete (RCC) Gravity Dam of a Water-control Project in Cold Area

机译:寒冷地区水控制项目的辊压缩混凝土(RCC)重力坝初探

获取原文

摘要

The some key water-control project in Xinjiang is made up of main dam (RCC gravity dam), auxiliary dam (1# and 2# clay core dam), water release structure (crest outlet, middle and bottom outlet), water intake structures for power generation (water-intake type ground plant in the right bank, water inlet tower, one high-pressure pipeline, bifurcated pipe) and power plant. The main features and technical difficulties are as follows: (1) Adverse weather condition in dam site area. Hot in summer, cold in winter, the annual temperature difference (average temperature difference between the highest and the lowest is 67. 5°C, extremely 89. 9°C) and daily temperature difference (average 12. 8 - 16. 2°C) are very large. The evaporatation is strong, normal evaporation is as much as 10 times of the average precipitation. The average wind speed is 1. 8m/s, with the maximum wind speed being 25m/s. The project is located in dry and cold region, cold, hot, wind, dry weather is very extrusive, so the problem of concrete temperature control is extremely prominent; (2) the groundwater is erosive. From No. 35 to No. 39 dam section, pyrite distribution on cracks surface is relatively concentrated. Particularly in No. 37 dam section, pyrite oxidation belt depth is larger; (3) The concrete aggregate is Gneiss granite artificial aggregate mixed with natural sand, this kind of concrete aggregate mixture scheme has no engineering example.
机译:新疆一些关键水控制项目是由主坝(RCC重力坝),辅助坝(1#和2#粘土芯坝),水释放结构(波峰出口,中部和底部出口),水摄入结构的向上用于发电(在右银行进水型磨碎的植物,水入口塔,一个高压管线,分叉管)和发电设备。主要特点和技术难点如下:在坝址区(1)恶劣天气条件。在炎热的夏天,冬天冷,全年温度差(最高和最低之间的平均温度差为67 5℃,极其89. 9°C)和每日温度差(平均12 8 - 16 2° C)是非常大的。所述evaporatation强,正常蒸发是平均沉淀的高达10倍。平均风速为1 8米/秒,最大风速为25米/秒。该项目位于干冷的地区,冷,热,风,干燥的天气非常喷出,使混凝土温度控制问题极为突出; (2)地下水是侵蚀性。从第35号至39号坝部,上表面裂纹黄铁矿分布相对浓缩。特别是在第37号坝部,黄铁矿氧化带深度较大; (3)混凝土骨料是片麻岩花岗岩人工与天然砂骨料混合,这种混凝土骨料混合物方案没有工程实例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号