首页> 外文会议>International Yellow River Forum on Sustainable Water Resources Management and Delta Ecosystem Maintenance >Analysis of Trans-basin Diversion Project Impact on the Yellow River Water Resource Distribution Pattern
【24h】

Analysis of Trans-basin Diversion Project Impact on the Yellow River Water Resource Distribution Pattern

机译:跨河流域导流项目对黄河水资源分布模式的影响分析

获取原文

摘要

The Yellow River water distribution plan, which was approved by the State Council in 1987 has established the basis for the river water resource distribution before operation of the South-to-North Water Diversion Scheme (the Scheme), which consists of the east, middle and west line projects, together with the Yangtze, Huai, Yellow and Hai Rivers, forming "four transversal and three longitudinal" water routes for "South-North regulation and East-West coordination". The paper analyses the water resource situation of the Yellow River, scope of water supply by all diversion schemes and water supply targets, evaluates the position and role of the Scheme in water resource distribution of the river basin, and concludes that with the east and middle line projects under construction, the unified planning for resolving water shortage of the river basin still requires urgent implementation of the west line project.
机译:1987年由国务院批准的黄河水分配计划已在南北省北方地水方案(该计划)的运营前设立了河流水资源分配的基础,该计划由东部,中间组成和西线项目,与长江,淮,黄色和海河,形成“四个横向和三个纵向”水路,为“南北法规和东西协调”。本文分析了黄河的水资源状况,所有转移方案和供水目标的供水范围,评估了该方案在河流流域水资源分布的地位和作用,与东部和中部的结论在建设中的线路项目,解决河流流域水资源短缺的统一规划仍需要紧急实施西线项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号