首页> 外文会议>Sulphur Conference >Balancing Energy Needs in the Sulphur Recovery Train
【24h】

Balancing Energy Needs in the Sulphur Recovery Train

机译:在硫磺恢复火车中平衡能量需求

获取原文

摘要

Culminating from 4 years of performing Integrated Energy Audits~(TM) at sulphur recovery and gas treating plants - mapping of energy utilisation has been refined to a point where it is now evident there is a need to balance the energy flows for energy optimisation and conservation. Total energy consumption in the typical gas processing train represents 10% of throughput and experience gained from audits in these plants indicates energy savings ranging from 10 to 25% of that demand, equivalent to an economic advantage of 1 to 2 million Euros per year per plant.
机译:在硫磺回收和天然气处理植物中执行综合能源审计〜(TM)的〜(TM) - 能源利用的映射已被精制到现在显而易见的是,需要平衡能量优化和保护的能量流动。典型的天然气处理列车中的总能耗代表了10%的吞吐量,并且在这些植物中的审计中获得的经验表明,节能范围从10%到25%的需求,相当于每株每年1至200万欧元的经济优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号