SANTEE COOPER CROSS GENERATING STATION, UNITS 3 4: THE NEW GENERATION OF CLEAN, EFFICIENT COAL POWER

机译:Santie Cooper交叉发电站,单位3和4:新一代清洁,高效的煤电

获取原文

摘要

Santee Cooper, South Carolina's state owned electric and water utility, is currently constructing two 600 MW class units at the Cross Generating Station, which will be two of the largest and cleanest coal fired units built in the US in the last 15 years. Upon achieving commercial operation in 2007 and 2009, these units will support Santee Cooper's role in supplying electricity to over 150,000 residential customers as well as to 20 electric cooperatives, 32 large industrial facilities, several municipal utilities and the Charleston Air Force base. Santee Cooper's Cross Generating Station located in Berkley County, South Carolina is a four unit site with two 600 MW class coal fired units currently in operation. Cross Unit #2, supplied by ALSTOM, has been in operation since 1984. Cross Unit #1 has been in operation since 1995. In July 2002, ALSTOM Power was awarded the contract to supply and install a 600 MW class coal fired boiler, including selective catalytic reduction (SCR) units and boiler auxiliary equipment for Unit #3 at Santee Cooper's Cross Generating Station. ALSTOM received a subsequent order for an identical unit for Cross Unit #4 in May 2004. Both units will have the ability to burn Eastern Bituminous Coal as well as a blend of up to 30% Petroleum Coke. Upon achieving commercial operation of Cross Unit #4 in 2009, ALSTOM will have supplied boilers with over 1800 MW of coal fired capacity at this station.
机译:Santee Cooper,南卡罗来纳州的国家拥有电气和水实用,目前正在建造两台跨发电站的两位600兆瓦,这将是过去15年来美国建造的最大和最干净的燃煤单位。在2007年和2009年实现商业化运作,这些单位将支持桑蒂库珀在以20个电力合作社,32个大型工业设施,几个市政公用事业和查尔斯顿空军基地,以超过15万居民用户供电以及作用。 Santee Cooper的交叉发电站位于南卡罗来纳州伯克利县,是一个四个单位网站,目前有两个600 MW型燃煤单位。由Alstom提供的交叉单元#2自1984年以来一直在运作。自1995年以来,交叉单位#1一直在运作。2002年7月,阿尔斯通电力被授予提供的合同,并安装600兆瓦燃煤锅炉,包括600兆瓦燃煤锅炉,包括在Santee Cooper的交叉发电站的单位#3的选择性催化还原(SCR)单位和锅炉辅助设备。 Alstom在2004年5月收到了交叉单元#4的相同单位的后续订单。两个单元都能能够燃烧东方沥青煤以及最多30%的石油焦的混合物​​。在2009年实现交叉单元#4的商业运营后,阿尔斯通将在该站提供超过1800兆瓦的煤炭燃烧能力的锅炉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号