首页> 外文会议>NATO Advanced Research Workshop on Scientific and Technical Issues in the Management of Spent Fuel of Decommissioned Nuclear Submarines >CONCEPT OF COMPLEX DECOMMISSIONING OF CIVIL NUCLEAR POWERED SURFACE SHIPS AND MAINTENANCE VESSELS
【24h】

CONCEPT OF COMPLEX DECOMMISSIONING OF CIVIL NUCLEAR POWERED SURFACE SHIPS AND MAINTENANCE VESSELS

机译:民用核动力表面船舶和维护船舶复杂退役的概念

获取原文

摘要

Practical solution of the challenges related to complex decommissioning of NPSS has become rather topical in recent years. So far "Lenin" NIB and "Sibir" NIB (being formally still in service) have been stored afloat; standard service life and the resource of main equipment and SPI systems of "Arctica" NIB expired in 2000. Due to expiration of SPI standard resource (100 000 hours) all presently operating NIBs are to be taken out of service from 2004 to 2009. Implementation of SPI resource prolongation measures up to 150 000 hours and their service life extension up to 30 years would allow postponing the onset of NIB withdrawal from service until 2010-2015. The only option of RC equipment management has been implemented so far providing for preparing of the taken-out-of-service NIB to protracted (10 - 15 years) waterborne storage on the berth of "Atomflot". The whole scope of preparatory works, including in-dock overhaul, is performed at "Atomflot". Appropriate complex decommissioning of civil nuclear ships including processing and disposal of contaminated equipment and materials would be only possible if a special federal program were developed and implemented with the participation of interested agencies. Such a program should provide for construction of a specialized up-to-date ship-cutting enterprise to conduct works in compliance with the present-day radioecological safety requirements. Of a variety of complex decommissioning options considered in the paper, the most promising options are: -NIB in-dock cutting and making up of RC unit complying with the requirements on its transfer for long-term storage and -making up of the "nose part" and the "stern part" of NIB prepared to transfer at scrap-metal enterprises for subsequent cutting. After "Atomflot" procurement with a floating dock, design 'V960', a new opportunity has emerged on considerable extension of the scope of work on complex decommissioning of NPSS at "Atomflot" down to making up of floating RC unit. However such works would require important capital investments for further development of the enterprise including extension of work sections, storage facilities, sanitary and utility areas, etc.
机译:近年来,与综合退役有关的挑战的实际解决方案变得相当局部。到目前为止,“列宁”笔尖和“SIBIR”的笔尖(正式仍在服务中)已经储存了漂浮的;标准使用寿命和“Arctica”Nib的主要设备和SPI系统的资源于2000年到期。由于SPI标准资源的到期(100 000小时),所有目前运营的笔尖都将从2004年至2009年脱离服务。实施SPI资源延长措施高达15万小时,其使用寿命延长长达30年,允许在2010-2015之前推迟尖端撤离的爆发。迄今为止,RC设备管理的唯一选择已经实施,以便在“雾蝇”泊位上的水上储存的延长(10 - 15岁)的水上储存提供了准备。在“Atomflot”中,在“Atomflot”中进行了准备工作的整个备注范围,包括码头大修。如果在兴趣的参与参与和执行兴趣机构的参与,则只能在包括污染设备和材料的加工和处置,包括加工和处置污染设备和材料的适当复杂的核船舶退役。这样的计划应提供专业的最新送货企业的建设,以符合本日的射读安全要求。在本文中考虑的各种复杂的退役选项中,最有前途的选择是:-NIB舷内切割和构成RC单元,符合其转移要求的长期储存和制造的“鼻子部分“和”斯特恩部分“的笔联准备在废料 - 金属企业转移以进行后续切割。在“雾化”采购与浮船坞的采购之后,设计“V960”,在“雾化”下载量的“雾化”下的工作范围的工作范围,建成浮动RC单位的工作范围的相当长。然而,这些作品需要重要的资本投资,以进一步发展企业,包括延长工作组,储存设施,卫生和公用事业区等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号