首页> 外文会议>Natural Gas Technologies Annual Conference and Exhibition >Environmental Assessment Case Study: AES Parana Power Plant Development Project in San Nicolas, Argentina
【24h】

Environmental Assessment Case Study: AES Parana Power Plant Development Project in San Nicolas, Argentina

机译:环境评估案例研究:阿根廷圣尼古拉斯的AES Parana电厂开发项目

获取原文

摘要

The paper describes the electric utility generation project that was constructed at the site of the existing Central Termica San Nicolas (CTSN) power plant in San Nicolas, Argentina about 240 km northwest of Buenos Aires and the projects environmental impact. The principal elements of the Project include a new 830 MW power generation plant, a 16 km natural gas pipeline to supply fuel to the Project from a high-pressure trunk line, and a 9 km 500 KV electric transmission line to connect to the national grid. The new plant is expected to have a natural gas supply for all of its daily requirements, with the potential for supply interruptions of up to thirty days per year. In planning this project a number of environmental impact considerations were studied. Assessment area examples include; Geology, Topography, Climatology, Meteorology, Air Quality, Noise, Hydrology And Water Quality, Ecology, Socio-Economic Conditions Archeological, Historical And Cultural Resources. The primary results of these environmental assessments are summarized in the paper.
机译:本文介绍了在阿根廷圣尼古拉斯的现有Central Termica San Nicolas(CTSN)发电厂的网站上建造的电力发电项目,约240公里的布宜诺斯艾利斯和项目环境影响。该项目的主要元素包括新的830 MW发电厂,一个16公里的天然气管道,可以从高压行李箱线向项目提供燃料,以及9公里500 kV电动传输线,以连接到国家网格。预计新工厂将为所有日常需求进行天然气供应,每年供应中断最长30天的可能性。在规划该项目时,研究了许多环境影响考虑因素。评估区域的例子包括;地质,地形,气候学,气象学,空气质量,噪音,水文和水质,生态,社会经济条件考古,历史文化资源。这些环境评估的主要结果总结在论文中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号