【24h】

IRON REMOVAL IN THE SKORPION PROCESS

机译:铁散过程中的烫发

获取原文

摘要

As the first mine-to-metal zinc operation utilising atmospheric leaching, solvent extraction and electrowinning, Skorpion Zinc faces unique challenges and opportunities. One of these challenges is found in the solvent extraction circuit, in which diethylhexyl phosphoric acid (D2EHPA) is used as the organic extractant. Although D2EHPA is an excellent extractant for zinc, it suffers from the co-extraction of ferric iron, which is produced during leaching and by the corrosion of the grinding media. This situation is partially mitigated by iron precipitation in the neutralisation step prior to solvent extraction. Unfortunately, some ferric iron still reports to the solvent extraction process. This leads to a slow build up of iron in the organic phase. Chemical stripping is used to maintain the Fe concentration at an acceptable level. In this paper, the efficiency of the iron removal process is discussed.
机译:作为利用大气浸出,溶剂萃取和电解的第一矿锌运行,Skorpion锌面临着独特的挑战和机遇。这些挑战之一是在溶剂萃取电路中发现,其中使用二乙基己酸(D2ehPA)作为有机萃取剂。虽然D2ehPa是锌的优良萃取剂,但它受到铁铁的共萃取,其在浸出过程中产生和通过研磨介质的腐蚀。在溶剂萃取之前通过中和步骤中的铁沉淀部分减轻这种情况。不幸的是,一些铁铁仍然向溶剂提取过程报告。这导致有机相中的铁缓慢。化学剥离用于将Fe浓度保持在可接受的水平。在本文中,讨论了铁去除过程的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号