首页> 外文会议>Iron and Steel Technology Conference >New Pulverized Coal Injection System at the Blast Furnaces of Salzgitter Flachstahl, Germany
【24h】

New Pulverized Coal Injection System at the Blast Furnaces of Salzgitter Flachstahl, Germany

机译:德国Salzgitter Flachstahl的高炉新型煤粉注射系统

获取原文

摘要

At the beginning of 2015, a new Pulverized Coal Injection (PCI) system has been commissioned at Salzgitter, supplying pulverized coal (PC) to Salzgitter Flachstahl No. A and No. B Blast Furnaces. In this paper, the technical and economic reasons for implementing PCI are explained. The features of the PCI system, including two self-inert grinding and drying plants with vertical roller mills, and two PCI plants with high-accuracy pulverized coal distribution control and minimized transport gas input into the Blast Furnaces, are described. The effect of injection on the overall blast furnace process is described and some results during the ramp up and the performance tests are also presented.
机译:在2015年初,新的粉煤喷射(PCI)系统已在Salzgitter中委托,将粉煤(PC)提供给Salzgitter Flachstahl No. A和No. B高炉。在本文中,解释了实施PCI的技术和经济原因。描述了PCI系统的特点,包括具有垂直滚筒研磨机的两个自惰性研磨和干燥设备,以及具有高精度粉煤分布控制和输入到高炉进入高炉的两个PCI工厂。描述了注射对整体高炉过程的影响,并且还在加速期间产生了一些结果,并且还提出了性能测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号